Thank you for your patience while we retrieve your images.
Taken 4-Jan-23
Visitors 0


5 of 8 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions3000 x 2000
Original file size1.09 MB
Image typeJPEG
Color spaceAdobe RGB (1998)
Date taken4-Jan-23 13:20
Date modified4-Jan-23 13:38
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON Z 9
Focal length16 mm
Focal length (35mm)16 mm
Exposure1/800 at f/5
FlashNot fired
Exposure bias0 EV
Exposure modeManual
Exposure prog.Manual
ISO speedISO 100
Metering modePattern

New Palestine council approves funds to move forward with redesign of their wastewater treatment plant. Preliminary engineering report costs have been submitted and approved. They plan to start the designs in 2023 and get it finalized ASAP. The council approved $915,000 for the preliminary designs which with design costs estimated at $2.8 million for the total $26 million estimated project. Wednesday, Jan. 4, 2023. (Tom Russo | Daily Reporter)